How Long Does HITRUST Certification Take?

HITRUST says an e1 can be completed in as few as 4 to 6 weeks if you are ready, and that most companies complete the i1 within 6 to 12 months. The r2 usually takes longer. Your real timeline is set by how much you must fix first, because HITRUST requires new or remediated controls to operate for 90 days before they can be tested.

HITRUST says an e1 can deliver assurance “in as few as 4–6 weeks, depending on readiness” (HITRUST) and that “most companies complete the i1 certification process within 6–12 months” (HITRUST). HITRUST does not publish an overall figure for the r2, its largest assessment. For the process as a whole, one industry estimate puts the full process at “between three and eighteen or more months” (Vanta).

The range is wide because the biggest variable is not the assessment itself. It is how much you have to fix before testing can start, and HITRUST’s rules put a hard floor under that.

How long does each HITRUST assessment take?

e1i1r2
HITRUST’s stated timingAs few as 4 to 6 weeks, depending on readinessMost companies finish within 6 to 12 monthsNo published overall figure
Maximum assessor fieldwork90 days90 days90 days
HITRUST post-submission service levelNot greater than 30 business daysNot greater than 45 business daysNone published that we found
Valid for1 year1 year2 years, with an interim assessment

Sources: HITRUST’s e1, i1 and r2 pages; fieldwork limit from the Assessment Handbook; service levels from advisories HAA 2023-004 and HAA 2021-012. HITRUST’s timing figures assume readiness; treat them as best cases, not quotes.

What are the phases of a HITRUST certification?

PhaseWhat happensHITRUST ruleTypical duration (estimate)
Scoping and pre-assessmentDefine systems, locations and data; set up the assessment in MyCSFNoneUnder 1 month
Readiness assessmentScore yourself against the requirements and find gapsOptional; HITRUST does not QA readiness resultsUnder 4 months
RemediationFix the gaps, then let the fixes run90 days for controls, 60 days for policies and procedures before testing2 to 6 months
Validated assessmentYour External Assessor tests controls and evidenceFieldwork capped at 90 daysUp to 90 days
CAPs and submissionDocument corrective action plans, sign the management representation letter, submitAs much time as needed for CAPsVaries
HITRUST QA and reportHITRUST reviews the assessment and issues the report30 business days (e1) or 45 (i1) service levelUnder 2 months

HITRUST rules are from the Assessment Handbook and HITRUST’s pre-submission timeline. Duration estimates other than the 90-day fieldwork cap are Vanta’s reference ranges (Vanta), which it describes as only a reference point.

Why does the 90-day incubation period matter so much?

It is the single rule most likely to move your date. HITRUST requires every control to be “implemented for a minimum of 90 days prior to testing,” whether it is new or was remediated after a gap was found. The control must have been operating in its current state for 90 consecutive days. Policies and procedures need 60 days (Assessment Handbook, sections 11.2.8 and 11.2.10).

There is no partial credit. If a control has not met its incubation period, it must be scored on its state before the fix (section 11.2.11).

A simple example shows the effect. Say readiness finds that multi-factor authentication is missing on one system, and you switch it on March 1. That control cannot be tested as implemented until it has run for 90 consecutive days, which takes you to the end of May. If fieldwork was planned for April, you either accept the lower score or move fieldwork. In practice:

  • A gap found in readiness costs at least 90 days before that control can count, so finding gaps early is the cheapest way to save time.
  • A policy gap found during fieldwork can still be fixed if you do it within the first 30 days, because 60 days of incubation then fit inside the 90-day fieldwork window.
  • Controls run by a service provider do not need to wait if you can show the provider’s control has been in place for at least 90 days, and if the provider holds a HITRUST certification you may be able to inherit the control right away (section 11.2.9).

What happens after fieldwork ends?

Your External Assessor may spend up to two weeks after the fieldwork end date on its own QA review and wrap-up, but no new testing or evidence collection is allowed in that period. You then sign the management representation letter and enter any required corrective action plans (CAPs), and HITRUST allows “as much time as needed” for that step before submission (HITRUST).

Submission runs on a reservation system. You book a QA “block,” a one-week period in which HITRUST begins its review, and reservations can be made up to a year in advance. HITRUST says to expect to hear from it within seven to ten business days after the end of the block (Assessment Handbook, section 13.1). From there, HITRUST’s published service levels are not greater than 30 business days with HITRUST for the e1 and 45 for the i1, and assessments that go into escalated QA because of quality concerns are exempt (HAA 2023-004, HAA 2021-012).

How long does recertification take?

Renewal is lighter than the first time, at least for the i1 and r2:

  • r2 interim assessment. To keep a two-year r2 certification, you must submit an interim assessment in the 90-day window before the one-year anniversary of the certification. It covers one randomly selected requirement from each assessment domain plus every requirement that needed a CAP (Assessment Handbook, section 15.4). A full r2 is required again at the end of the two years (HITRUST).
  • i1 rapid recertification. An eligible i1 holder can recertify by testing a sample of 60 previously scored requirements, plus any marked N/A or needing a CAP, and rolling forward prior scores for the rest (HAA 2023-005).
  • e1 renewal. The e1 is valid for one year and must be renewed annually. A rapid option exists only for certain combined e1 assessments, and the core e1 requirements must always be fully reassessed (Assessment Handbook, section 15.5).

How can you shorten the timeline?

  1. Start readiness early. Every gap you find starts a 90-day clock; the sooner it starts, the sooner you can test. Many assessor firms offer this work; for example, Clearwater, one of the firms listed in our directory, says its HITRUST assessors identify control gaps and help prioritize remediation.
  2. Choose the assessment your customers actually require. The e1 and i1 have fixed requirement sets; the r2 is tailored to your risk profile, and its baseline already includes every i1 requirement. See HITRUST e1 vs. i1 vs. r2.
  3. Keep the scope tight. Fewer systems and locations mean less evidence to collect and test.
  4. Inherit where you can. Controls already covered by a HITRUST-certified cloud provider do not need their own incubation period.
  5. Book your QA reservation early, and line up your External Assessor’s fieldwork dates before you need them. Our guide on how to choose a HITRUST assessor lists the scheduling questions to ask.

Timeline and budget move together; for the cost side, see how much HITRUST certification costs.

Ready to compare firms? Browse authorized HITRUST External Assessors in our assessor directory, or get matched with assessors that fit your assessment type and target date.

Frequently asked questions

How long does HITRUST certification take?

It depends on the assessment and your readiness. HITRUST says an e1 can take as few as 4 to 6 weeks for a prepared organization and that most companies complete an i1 within 6 to 12 months. HITRUST does not publish a single figure for the r2. One industry estimate puts the whole process at three to eighteen or more months.

What is the HITRUST 90-day incubation period?

HITRUST requires any control that is newly implemented or remediated to have been operating in its current state for at least 90 consecutive days before it can be tested as implemented. Policies and procedures need at least 60 days. If a control has not met the incubation period, it is scored as it was before the fix.

How long is HITRUST fieldwork?

All of the External Assessor's testing for a validated assessment must take place within a fieldwork period of no more than 90 days, for e1, i1 and r2 alike.

How long does HITRUST QA take after submission?

HITRUST has published post-submission service levels of not greater than 30 business days with HITRUST for the e1 and 45 business days for the i1, excluding assessments that enter escalated QA. We did not find a published service level for the r2.

How long is a HITRUST certification valid?

e1 and i1 certifications are valid for one year. An r2 certification is valid for two years, provided an interim assessment is submitted in the 90 days leading up to the first anniversary.